Case Studies

Gripple products are in use in a variety of applications, on a multitude of projects around the world. Explore the full range of case studies demonstrating the significant time, labor and cost savings Gripple solutions can deliver on your next project.

Building Services

US Bank Stadium, Minneapolis

26 February 2020

Gripple Inc. worked with the Harris Mechanical team on this project-Minnesota’s largest commercial construction project to date--to provide cable hanger solutions for all of the ductwork and VAV boxes being suspended.

Read more
Building Services
Dodge Street, Nebraska
05 May 2020
Agriculture
Al Fountain Vineyard, Alderdale, Washington
26 February 2020
Civil Construction
Hillsboro Canal Package, Florida,
26 February 2020
Seismic Bracing
Mercy Hospital
26 February 2020
Building Services
Dodge City High School, Kansas
26 February 2020
Building Services
US Bank Stadium, Minneapolis, MN
26 February 2020
Building Services
9th & Colorado, Colorado
26 February 2020

Gripple TV

The official video resource for Gripple Ltd - subscribe for access to the latest video material

View Channel
Use our product finder to verify your specifications and get suggestions for suitable products!

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimize health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements, and embodied CO2
  • A range of support services at every stage of your project, provided by a dedicated technical team
  • Aesthetically pleasing solutions, lightweight, and virtually invisible
;