AMAZON BOM1, Mumbai, Electrical
02 February 2022When Amazon decided to refurbish its first fulfilment centre in Mumbai, the main challenge was to remove the existing electrical installation and replace it with new services in a tight time frame. The Gripple solution enabled them to save 19 weeks in total on the installation
Read more