King Henry VIII School - Abergavenny, Wales

In collaboration with Whitehead Building Services and Morgan Sindall Construction, Gripple supported the delivery of a £63 million school development project with innovative solutions that made a real difference. From split deliveries for efficient inventory management to technical designs that streamlined installation and reduced waste, our contributions helped keep the project on track.

Onsite support ensured smooth implementation and elevated health and safety standards, through the thorough system training provided. As a trusted UK manufacturer, Gripple provides contractors with complete material traceability and sustainability insights through tools like EPDs and embodied carbon reporting, helping the project achieve key environmental targets without compromising on quality or compliance.

Watch the video below to learn more about how Gripple products contributed to this successful project.

We implemented the 10 Ton Challenge initiative for this project to reduce carbon emissions on the project by 10 tons. Using Gripple products played a key role in achieving this goal, supported by robust data such as EPDs and other sustainability documentation. This comprehensive information made it straightforward to demonstrate and communicate the carbon reduction benefits effectively.
Darren Rhys-Thomas - Senior Design Manager at Morgan Sindall
We chose the Gripple Fast Trak bracket system for its ease of installation. It comes prepackaged, all cut to length, eliminating the need for hot works on-site. We're not having to spin nuts up the rods – it's literally push the end caps in and up you go up to the desired height. The site guys found the switch very good, as Gripple produced drawings to follow, stating what brackets go where, the length, and the size. From an install point of view, it flowed seamlessly.
John Bounds - Electrical Project Manager at Whitehead Building Services

Fast Trak by Gripple – Pre-Fabricated Channel System for M&E Services

Our Fast Trak pre-fabricated channel system will change the way you install suspended M&E services forever!

Designed by our engineers, for engineers. If you’re installing electrical containment, pipework, ductwork or other mechanical services you need to know about Fast Trak.

Our innovative Fast Trak system is made up of our prefabricated slotted channel, our patented 'Track' and 'Cartridge', allowing you to safely install a complete trapeze bracket up to six times faster than traditional rod and strut.

Click here to discover more about our Fast Trak range.

Enquire Now

Interested in our range of Gripple solutions? Just fill out our enquiry form and one of our local Gripple experts will be in touch ready to assist.

We would love to keep in touch with relevant information which we feel would be of interest to you?
See our privacy policy here for more details.

Tags: Building Services

Related Stories

Building Services
Rutland Mills, Wakefield
20 December 2024
Building Services
Welsh Medium Primary School, Rhydyfelin
09 March 2023
Building Services
Urgent & Emergency Care Centre, Walsall, West Midlands
30 June 2022

Featured Products