Hampstead School, London

Hampstead School received investment under the government led Priority Schools Building Programme (PSBP), which was launched to help address the needs in the worst condition schools. The Education Funding Agency (EFA), which is the delivery arm of the DfE, is managing the programme. Hampstead School will benefit from refurbishment and re-organisation of a number of existing buildings along with a brand new building.

Building Type: Education
Location: London
Main: Wates
Mechanical & Electrical Contractor: Industrial Power Solutions (IPS) and ACM
Services: Mechanical and Electrical

Hampstead School received investment under the government led Priority Schools Building Programme (PSBP), which was launched to help address the needs in the worst condition schools. The Education Funding Agency (EFA), which is the delivery arm of the DfE, is managing the programme. Hampstead School will benefit from refurbishment and re-organisation of a number of existing buildings along with a brand new building.

Wates Construction have developed a way to implement projects that integrate across all areas of the supply chain. This process encompasses design, estimation, delivery and commissioning, giving Wates Construction the ability to self-deliver projects in the same way as a traditional M&E subcontractor. The Gripple products utilised on the Hampstead School project were sourced by Wates Construction, but installed by approved sub-contractors Industrial Power Solutions (IPS) and ACM.

The Gripple Universal Channel and Trapeze Plus provide a quick pre-fabricated alternative to threaded rod and slotted channel, which require “hot works”, cutting and filing on-site. The Trapeze Plus can be pre-installed onto the channel and features an easy-to-use integral release button for finite adjustment. The locking screw can also be tightened for ultimate security.

Gripple had a positive effect on the program reducing the initial schedule, and helped us work towards achieving our BREEAM Excellent rating.
MEP Project Manager, Wates

Wates Construction opted to use the new Low Profile Brackets and QT Compact Clamps to suspend the majority of pipework. The Low Profile Bracket is ideal when pipework has to be mounted close to the soffit or wall. The QT Compact Clamp replaces 11 different pipe sizes and can be fitted to the Low Profile Bracket via a tool-less quarter turn attachment. Using the Gripple solution allowed for the pipework to be fitted less than 35 mm from the soffit and took 50% less lime to install compared to traditional brackets and clamps.

The embodied carbon was reduced by 98%. Over 1.3 tonnes when compared to threaded rod. Saving the equivalent of a seat on a return flight from London to Beijing.

Download
Tags: Building Services

Related Stories

Building Services
London Design & Engineering - UTC, London, UK
16 September 2019
Building Services
Abbey Grove Care Home, Worksop
27 May 2019
Building Services
Glebe Farm School, Milton Keynes
04 April 2022

Featured Products

UniGrip™ - Standard

The next generation of wire rope suspension products designed for the fast suspension of cable containment, pipework, ductwork, HVAC systems and modules, including multi-tier installations.

» View this product

UniGrip™ – Central Exit

The next generation of wire rope suspension products designed for the fast suspension of cable containment, pipework, ductwork, HVAC systems and modules, including multi-tier installations.

» View this product

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimise health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by our technical team