IKEA, Worli

IKEA purchased and renovated an old building in the financial capital, Mumbai. The building is now a prominent two-story IKEA store.

It was very easy to install duct with gripple we saved a lot on labour cost. I’d recommend using Gripple.
Mr Amol, Site Manager, KD Building Solutions

400 HOURS

TIME SAVINGS

36,000 INR

LABOUR SAVING

21,000 INR

TOTAL SAVING

Project Summary

 

Building type Commercial
Building Structure Concrete
Consultant WD partners
MEP Contractor KD Building Services
Application HVAC

PROJECT DETAILS

IKEA purchased and renovated an old building in the financial capital, Mumbai. The building is now a prominent two-story IKEA store.


A Gripple solution was utilised for elliptical ductwork throughout the open ceiling on both floors of the building. Because of this, the aesthetic mattered greatly. The clean, simplicity of wire rope fit the look perfectly
whilst also meeting a requirement - no drilling.


Even though the ceiling was an RCC slab, the structure was old and drilling was not permitted. By utilising the loop end fixing with an arrangement of horizontal beams made on site, KD building services were able to suspend all services within the time frame and save over 400 hours on site

IMG 20220308 WA0012
Download
Tags: Building Services

Related Stories

Building Services
DLF Downtown, Gurgaon
09 May 2022
Building Services
Amazon, BOM1 Fulfilment Centre
02 February 2022
Building Services
Safran HAL Aircraft, Bengaluru, Electrical
25 January 2022
Building Services
Delhi Development Authority Case Study
18 January 2022
Building Services
Pacific Mall, Jasola, HVAC
15 December 2021

Featured Products