Altensteig, Office Building, Germany

During the construction of a new office building in Altensteig, ventilation ducts were installed on 1,800 square
metres using the new Fast Trak fastening system. A total of 500 rails and 1000 beams were used.

“The installers were thrilled by the simplicity of the installation and the time advantage compared to traditional suspension methods. By using Fast Trak a total of 2 weeks working time was saved.”
- Project Manager -
  • Building type: Office building
  • Completion date: March 2022
  • Building structure: Concrete
  • Product suspended: Ventilation duct
Download
Tags: Building Services, Corporate, Events

  Gripple solution Traditional method
Overview Fast Trak Standard Threaded rod, C-rail
Material cost 4 377 € 3 980 €
Installation time 17 hours 100 hours
Labour rate (per hour) 45 € 45 €
Total labour cost 765 € 4 500 €
Total cost 5 142 € 8 480 €

Cost result from calculations of the Gripple solution used in the project, compared with the conventional method.

Related Stories

Building Services
Student Residence, Bamberg, Germany
08 February 2022
Building Services
School Building, Saint-Germain-en-Laye
19 November 2020
Building Services
Offices, ZAC Paris Nord 2, France
29 January 2020

Featured Products

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimise health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by our technical team