Project Summary

  • Building type Warehouse
  • General Contractor Pomerleau
  • Engineer NORR
  • Contractor Marcotto Mechanical
  • Services HVAC

 

Marcotto Mechanical used Gripple’s UniGrip, Standard Hanger and Duct Trapeze at the Canada Post facility in Scarborough. The products suspended ductwork with various types of attachments throughout the building.

Gripple was chosen because the product range on offer proved to be more versatile and had higher load capacities than it’s competitors. The Gripple team was able to identify point loads and provide suitable hangers for each identified load. They also provided a layout drawing with the estimated hanger quantities needed on the project as well as estimated weight, cost and labour savings.

“Our project is still currently in progress but it is safe to say that we have saved a lot of time by using the Gripple system so far. It has proven to be a very fast and effective way to support our duct and equipment.” - Matthew Roncato, Marcotto Mechanical

Download
Tags: Building Services

Related Stories

Building Services
MKT Restaurant, Montreal, Quebec
11 December 2019
Building Services
CHUM Hospital (HVAC), Montreal, Quebec
25 August 2020
Building Services
New Academic Pavilion St-Jean Garrison (HVAC), St. Jean-sur-Richilieu, Quebec
11 December 2019

Featured Products

Why use Gripple?

  • Significant time and cost savings on your project
  • Complete, off-site solutions which minimise health and safety concerns
  • Innovative, patented solutions designed by an in-house team of engineers
  • Considerable reductions in packaging, vehicle movements & embodied CO2
  • A range of support services at every stage of your project, provided by our technical team